SPL Splicing SPL-03 Step 3 of 13

Closure and Cable Preparation

Prepare each cable to the closure maker's dimensions, clamp the strength member, bond the armor and clean the tubes.

ChecklistOn the Map

Crew

  • Lead Splicer
  • Splicer Helper

Hazards

  • Cuts from Sheath and Armor
  • Sharp Armor Edges
  • Glass Fiber Shards
  • Solvent Exposure

Purpose

Prepare every cable to the closure manufacturer’s dimensions, with the strength member clamped, the armor bonded and the tubes clean. This is the foundation of the splice. A nicked tube, a loose strength member or an unbonded armor shows up months later as a broken fiber or a safety hazard.

When to Do It

Roles

  • Lead splicer: marks lengths, makes the cuts, secures strength members and bonds the armor.
  • Splicer helper: holds and supports the cable, cleans tubes and keeps scraps and gel off the bench.

Equipment and Materials

  • Closure manufacturer’s instructions and its dimension template, if supplied.
  • Sheath cutter or ring tool, armor cutter and aramid shears.
  • Buffer-tube cutter sized for the tubes.
  • Gel cleaner approved by the cable manufacturer or owner and lint-free wipes, or tools to remove dry water-blocking material.
  • Closure grounding and bonding hardware.
  • Tape and markers for length marks.

Safety

Procedure

  1. Mark the sheath removal length per the closure instructions.
    • Measure from the reference point the closure instructions or template give (for example, where the cable enters the closure seal).
    • Use the manufacturer’s length for the closure model: per manufacturer instructions.
  2. Ring-cut and remove the jacket.
    • Set the ring tool depth so it scores the jacket without cutting into the tubes.
    • Flex the cable at the score to break the jacket, then slide it off. Use the ripcord where the cable has one.
  3. Remove the armor on armored cable.
    • Cut the armor to the marked length, leaving the length the closure’s bond clamp needs.
    • File or cover sharp armor edges, so they do not cut the tubes.
  4. Bond the armor to the closure’s grounding hardware.
    • Install the bond clamp per the closure instructions and the owner’s bonding spec.
  5. Secure the strength member.
    • Clamp the central or peripheral strength member in the closure’s strength-member clamp at the length the instructions give.
    • Tighten the clamp per the manufacturer, so cable movement pulls on the closure and not on the fibers.
    • Trim aramid yarn with aramid shears to the length the closure needs.
  6. Remove binders and ripcords, then clean the tubes.
    • Clean gel from buffer tubes with gel cleaner approved by the cable manufacturer or owner and lint-free wipes, or remove dry water-blocking tape and yarn.
  7. Route the tubes to the trays per the matrix.
    • Keep the bend radius the cable and closure manufacturers specify: per manufacturer instructions.
    • Secure tubes at the tray entry with the closure’s ties or clips.
  8. Open each buffer tube at the correct length.
    • Ring-cut the tube with a tube cutter at the length the tray needs, then slide the tube off to expose the fibers.
    • Clean the gel off the fibers with gel cleaner approved by the cable manufacturer or owner and a lint-free wipe.

Hold Points

Records to Keep

  • Photo of the prepared cables in the closure: strength-member clamps and bond clamps visible.
  • Cable ids and directions noted on the matrix as you prepare each cable.

Common Mistakes

  • Nicked tubes. A ring tool set too deep scores the tubes, and fibers break later. Set the depth on a scrap first.
  • Unbonded armor. It looks finished but leaves a shock hazard. Bond every armored cable.
  • Strength member not clamped. Any pull on the cable then goes straight to the fibers.
  • Gel left on the fibers. Gel ruins cleaves and splices. Clean until no gel remains on the fibers or your wipe.

Standards and References

  • Telcordia GR-771
  • NESC (IEEE C2)
  • Closure manufacturer’s instructions (dimensions, clamps, bonding).
  • Cable manufacturer’s instructions (bend radius, gel removal).
  • Owner bonding and grounding standard.

On the Map

Not applicable: no FAHMY tool covers cable preparation.

SPL-03 · Field Checklist

Checklist

0/9items ticked

Tick each procedure step and hold point as the crew completes it. Ticks stay on this device only. They are a personal aid, not a hold-point release or a project record; follow the owner’s sign-off process.

Procedure
Hold Points

OSP Map · Handhole Detail

On the Map

Open the map

Report an Issue

Spotted something wrong or out of date? Emailfeedback@fahmy.iowith the step and version (SPL-03, v1.0.0) and what you saw in the field.

FAHMY is a reference, not a substitute for owner specifications, the authority having jurisdiction, manufacturer instructions, training or qualified supervision. Follow your employer's safety program and all applicable laws.

Operations

More

Theme

Sunlight is maximum contrast for direct sun. Auto follows your device.