Fiber splicing step by step: job preparation, closure and cable preparation, fiber identification, fusion splicing, testing, documentation and emergency restoration.

Steps in Order

No checklist ticks saved on this device yet.

  1. SPL-01

    Job Preparation

    Arrive with the right prints, matrix, materials, tools and a clean workspace so you splice it right the first time.

    6 steps · 1 hold point

  2. SPL-02

    Safety for Splicing

    Protect eyes, skin and lungs at the splice bench, and work safely in manholes, vaults and aerial positions.

    8 steps · 1 hold point

  3. SPL-03

    Closure and Cable Preparation

    Prepare each cable to the closure maker's dimensions, clamp the strength member, bond the armor and clean the tubes.

    8 steps · 1 hold point

  4. SPL-04

    Mid-Span Access and Expressing Tubes

    Open a cable at mid-span and reach only the fibers you need, without disturbing the express fibers that stay in service.

    6 steps · 2 hold points

  5. SPL-05

    Fiber Identification and Routing

    Identify every tube and fiber with the TIA-598 color code and route each one to the right tray position, every time.

    4 steps · 1 hold point

  6. SPL-06

    Fiber Preparation: Strip, Clean, Cleave

    Make a clean, flat, perpendicular fiber end that is ready to splice, with the protection sleeve already on the fiber.

    5 steps · 1 hold point

  7. SPL-07

    Fusion Splicing (Single Fiber)

    Make low-loss, mechanically sound single-fiber fusion splices, protect each one and store it in matrix order.

    7 steps · 1 hold point

  8. SPL-08

    Ribbon (Mass Fusion) Splicing

    Splice whole fiber ribbons at once with the same quality as single fibers, then protect and store them in splice matrix order.

    10 steps · 1 hold point

  9. SPL-09

    Tray Organization and Labeling

    Leave trays that anyone can read and re-enter without damaging fibers, with clear labels on trays, cables and the closure.

    5 steps · 1 hold point

  10. SPL-10

    Closure Sealing, Grounding and Mounting

    Seal, test, ground and mount the closure, and store the slack neatly within bend radius so the splices stay protected for years.

    11 steps · 2 hold points

  11. SPL-11

    Testing and Acceptance

    Prove every fiber meets the owner's acceptance criteria with bidirectional OTDR and power meter tests, and keep the files.

    11 steps · 3 hold points

  12. SPL-12

    Documentation and Handoff

    Deliver splice reports, standard .sor OTDR files, photos and an updated matrix the owner can use for years.

    7 steps · 1 hold point

  13. SPL-13

    Emergency Restoration

    Restore service fast and safely after a cable cut, using OTDR to find the fault, then make the repair permanent and documented.